客户项目
Optical Lab
Each of the client’s four optical labs were originally warehouse spaces before being converted into light industrial facilities. All labs feature multiple optical processing lines and can produce 10,000 pairs of eyeglasses daily. Additionally, an ISO Class 7 clean room was integrated into each facility. These remodels exemplify MG2’s ability to balance the needs of existing operations with the demands of efficiently phasing new construction. To support the various mechanical, electrical, and maintenance activities, MG2 created design solutions aimed at maximizing space utilization.
-
Project Details
- 北美多个地点
- CWI
- 工业, 项目交付, Program Services
- 160,000平方英尺
- 建筑设计, Program Services